Aluminum Alloy Docks
Agile Clear Water Bay Yacht Club

Project Overview
Structure: Aluminum Alloy Pontoon
Quantity of Berths: 291
Yacht Accommodation: 30 ~ 300 Feet

1. This project is jointly built by GOODOCKS and Camper & Nicholsons. 
2. It’s the first marina town project in China. 

Agile Clear Water Bay Yacht Club is located in the central area of Clear Water Bay, Hainan, with a coastline of 12 kilometers. The planning was completed by the famous waterfront design consultant, NDA. Clear Water Bay Yacht Club was expected to build 780 international standard yacht berths. The total length of the revetment line of the marina is 7 kilometers, equipped with dry warehouses of 1,800 square meters, which are planned and developed in combination with the project theme of "Wonderful Ocean world".          


Considering the climate in Hainan Province and combining with the structural design of wind-proof and shock-absorbing performance, we built 291 berths in the first phase with aluminum alloy pontoon system whose main structure and fittings used ultraviolet protection. Although the pontoon system has been in operation for nearly 10 years, the overall structure and performance are in good condition, with no obvious color difference in appearance and low maintenance cost.